Journal Profile | |||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Journal Title | Structural Concrete | ||||||||||||||||||||||||||||
Journal Title Abbreviations | STRUCT CONCRETE | ||||||||||||||||||||||||||||
ISSN | 1464-4177 | ||||||||||||||||||||||||||||
E-ISSN | 1751-7648 | ||||||||||||||||||||||||||||
h-index | 26 | ||||||||||||||||||||||||||||
CiteScore |
| ||||||||||||||||||||||||||||
Self-Citation Ratio (2020-2021) | 33.20% | ||||||||||||||||||||||||||||
期刊简介 | Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum. | ||||||||||||||||||||||||||||
Official Website | http://onlinelibrary.wiley.com/journal/10.1002/(ISSN)1751-7648 | ||||||||||||||||||||||||||||
Online Manuscript Submission | https://mc.manuscriptcentral.com/suco | ||||||||||||||||||||||||||||
Open Access | No | ||||||||||||||||||||||||||||
Publisher | ROTHERSTRASSE 21, BERLIN, GERMANY, DEUTSCHLAND, 10245 | ||||||||||||||||||||||||||||
Subject Area | CONSTRUCTION & BUILDING TECHNOLOGY | ||||||||||||||||||||||||||||
Country/Area of Publication | GERMANY | ||||||||||||||||||||||||||||
Publication Frequency | |||||||||||||||||||||||||||||
Year Publication Started | 0 | ||||||||||||||||||||||||||||
Annual Article Volume | 307 | ||||||||||||||||||||||||||||
Gold OA文章占比 | |||||||||||||||||||||||||||||
OA期刊相关信息 | |||||||||||||||||||||||||||||
WOS期刊SCI分区 | |||||||||||||||||||||||||||||
Indexing (SCI or SCIE) | Science Citation Index Expanded | ||||||||||||||||||||||||||||
Link to PubMed Central (PMC) | https://www.ncbi.nlm.nih.gov/nlmcatalog?term=1464-4177%5BISSN%5D | ||||||||||||||||||||||||||||
Average Duration of Peer Review * | Authorized Data from Publisher: Data from Authors: >12 Week(s), or Invited contributions | ||||||||||||||||||||||||||||
Competitiveness * | Data from Authors: Easy | ||||||||||||||||||||||||||||
Useful Links |
| ||||||||||||||||||||||||||||
*All review process metrics, such as acceptance rate and review speed, are limited to our user-submitted manuscripts. As such they may not reflect the journals' exact competitiveness or speed. |
|
First Previous 1 2 3 Next Last (To Page | |
Reviews on Structural Concrete: | Write a review |
Author: liweiwoaini521@163.com Subject Area: Engineering and Materials Duration of Peer Review: 4.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2017-06-11 21:37:35 Submitted on January 19, 2017 and still under review. I have asked the editor and am now patiently waiting. ![]() ![]() |
Author: 学术垃圾小喵咪 Subject Area: Engineering Duration of Peer Review: 1.0 month(s) Result: Rejected Write a review |
Reviewed 2025-04-23 15:35:40 Just like in your situation, the opinions on the two reworkings were completely different. The first time was approved for a major revision, but the second time was rejected. The main reason for the rejection was that the issues that were deemed unacceptable during the second review were completely overlooked during the first review. ![]() ![]() |
Author: 老刘 Subject Area: Engineering Duration of Peer Review: 10.0 month(s) Result: Accepted after revision Write a review |
Reviewed 2025-03-12 09:00:54 Submitted on April 25, 2024; received reviewer comments on January 23, 2025; accepted on March 11, 2025. The review process was relatively long, but Dr. Swaminathan was very good and many detailed revisions were communicated through email. Very diligent! The journal is worth submitting to, with not much difficulty in the submission process. ![]() ![]() |
Author: 博士升 Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2025-02-27 19:02:55 2024.07.09 submit 2024.12.03 major revision 2024.01.13 return It's really slow, almost 8 months in total. ![]() ![]() |
Author: 永远的洋仔 Subject Area: Engineering Duration of Peer Review: 8.0 month(s) Result: Accepted after revision Write a review |
Reviewed 2025-02-08 10:02:25 2025.2.7 AC. The difficulty is not great, the speed is slow. ![]() ![]() |
Author: hydraulic Subject Area: Engineering Duration of Peer Review: 6.0 month(s) Result: Accepted after revision Write a review |
Reviewed 2025-01-17 21:23:42 Submission on June 13, 2024 - Acceptance on January 17, 2025. ![]() ![]() |
Author: 土木老妹 Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2025-01-17 13:04:06 How did you write to the editor? I submitted on October 12th and still haven't heard anything. ![]() ![]() |
Author: 木火通明888 Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2025-01-16 15:26:50 I submitted on October 6th and hadn't heard back until yesterday, so I wrote to the editor to ask about the progress. The editor replied saying that they hadn't found any reviewers yet, which was embarrassing. In September, one paper was revised and one was rejected by CBM. I have been working on experiments and simulations for fiber-reinforced concrete beams, and it feels like it has been eight months already. ![]() ![]() |
Author: 永远的洋仔 Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2025-01-16 12:56:52 Traditional concrete structure seismic direction, test + simulation, send a timeline for reference, to accumulate some good luck for yourself 2024.6.15 Submission 2024.12.1 Revision (not sure if it's a major or minor revision, two reviewers each raised four or five questions) 2024.12.15 Submission after revision 2025.1.16 Still no news, status is just "Under review", can't see progress like in Esvier. The journal is actually average, can't compare with the speed of ES, JBE, Structures, hoping for good luck in the future. ![]() ![]() |
Author: Anyin Peng Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2025-01-08 20:13:09 2025.01.08 Rejection It feels like the previous reviewer did not submit their comments on time, as their feedback was inconsistent, leading to the invitation of another reviewer. ![]() ![]() |
Author: hydraulic Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2025-01-02 13:43:10 2025.1.02 No news, the journal is good, but the reviewers are too slow. ![]() ![]() |
Author: hydraulic Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2024-12-24 20:03:56 What should we do when the deadline is up? Will we find a new reviewer? ![]() ![]() |
Author: CHRNPJ Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2024-12-24 14:34:54 The meaning should be that, while waiting for the second reviewer to respond, the time given to the reviewers is approaching the deadline for review. ![]() ![]() |
Author: hydraulic Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2024-12-22 19:32:27 We are currently awaiting the review report from the second reviewer, which is due soon. ![]() ![]() |
Author: 小曹 Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2024-12-22 17:56:04 I am willing to call it a civil engineering ceiling. It was awarded on January 11, 2024, underwent major repairs on May 3, returned on June 17, and underwent major repairs again on December 21. It was unused for a whole year. Those who do not know might think I am researching nature. The first major repair involved multiple discussions with my teacher and multiple revisions in language by other teachers. To be honest, this three-zone situation has made me deeply reflect on my academic level and my supervising teachers. ![]() ![]() |
Author: Anyin Peng Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2024-12-21 10:03:51 Still in UR on December 21, 2024. ![]() ![]() |
Author: dhsc Subject Area: Engineering Duration of Peer Review: 7.0 month(s) Result: Accepted after revision Write a review |
Reviewed 2024-12-20 11:24:04 3.29 submission 5.6 major revision 5.24 resubmission 8.13 third review 10.4 acceptance ![]() ![]() |
Author: Structures Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2024-12-19 20:58:24 Have you won again? It's been several months already. ![]() ![]() |
Author: hydraulic Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2024-12-16 09:38:07 Still UR on December 16, 2024. ![]() ![]() |
Author: Lingghg Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2024-12-06 12:37:39 I submitted the minor revisions on November 4th, but there has been no progress since then. ![]() ![]() |
Author: hydraulic Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2024-12-06 09:38:01 Still no news as of December 6th, 2024. ![]() ![]() |
Author: hydraulic Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2024-12-06 09:37:16 Whether there is a letter or not, last time I returned for repairs and they took my photo directly. I thought I had won. I've been waiting for so long, sigh. ![]() ![]() |
Author: Anyin Peng Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2024-12-01 11:09:56 There is no news yet, UR. ![]() ![]() |
Author: hydraulic Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2024-11-28 10:27:21 6.13 Submission 10.23 Minor revisions There has been no news until today, it's too slow. ![]() ![]() |
Author: hydraulic Subject Area: Engineering Duration of Peer Review: 0.0 month(s) Result: Pending & Unknown Write a review |
Reviewed 2024-11-28 10:26:03 Did you win the lottery? Our situations are similar. I did a minor repair on 10.23, but still haven't heard anything. ![]() ![]() |
First Previous 1 2 3 Next Last (To Page |