Research Creative   My Account   Submit My Manuscript
Letpub, Scientific Editing Services, Manuscript Editing Service

Browse Journals by Title


Journal name:   ISSN:   Subject area:   IF range: -
Index:   Category:   Open Access:   Sort by:
Journal Cover Design
APA has partnered with LetPub to provide a full suite of author services

[Proceedings of the Institution of Mechanical Engineers Part O-Journal of Risk and Reliability]Hello, you are Visitor Number 45656 on this page.

Journal Profile
Journal TitleProceedings of the Institution of Mechanical Engineers Part O-Journal of Risk and Reliability
Journal Title AbbreviationsP I MECH ENG O-J RIS
ISSN1748-006X
E-ISSN1748-0078
h-index23
CiteScore
CiteScoreSJRSNIPCiteScore Rank
4.500.4610.854
Subject fieldQuartilesRankPercentile
Category: Engineering
Subcategory: Safety, Risk, Reliability and Quality
Q269 / 207

Self-Citation Ratio (2020-2021)12.00%
期刊简介Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
Official Websitehttps://us.sagepub.com/en-us/nam/proceedings-of-the-institution-of-mechanical-engineers-part-o-journal-of-risk-and-reliability
Online Manuscript Submissionhttps://us.sagepub.com/en-us/nam/proceedings-of-the-institution-of-mechanical-engineers-part-o-journal-of-risk-and-reliability
Open AccessNo
Publisher1 OLIVERS YARD, 55 CITY ROAD, LONDON, ENGLAND, EC1Y 1SP
Subject AreaENGINEERING, MULTIDISCIPLINARY
Country/Area of PublicationENGLAND
Publication Frequency
Year Publication Started0
Annual Article Volume58
Gold OA文章占比
OA期刊相关信息
WOS期刊SCI分区
Indexing (SCI or SCIE)Science Citation Index Expanded
Link to PubMed Central (PMC)https://www.ncbi.nlm.nih.gov/nlmcatalog?term=1748-006X%5BISSN%5D
Average Duration of Peer Review *Authorized Data from Publisher:
Data from Authors: Slow, 6-12 Week(s)
Competitiveness *Data from Authors: Easy
Useful Links
Relevant Journals 【Proceedings of the Institution of Mechanical Engineers Part O-Journal of Risk and Reliability】CiteScore Trend
Comments from Authors
*All review process metrics, such as acceptance rate and review speed, are limited to our user-submitted manuscripts. As such they may not reflect the journals' exact competitiveness or speed.
  • Journals in the Same Subject Area
  • CiteScore Trend
  •  
    Reputable Journals within the Subject Area Impact Indicator
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENTH-index: 0

    CiteScore: 8.70
    Most Searched Journals within the Subject Area Page Views
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT50449
  •  

    Proceedings of the Institution of Mechanical Engineers Part O-Journal of Risk and Reliability Proceedings of the Institution of Mechanical Engineers Part O-Journal of Risk and Reliability
    Your prediction for next year:
    Steady Increase No Change Gradual Decline  Refresh


First    Previous    1    2    Next    Last  (To Page
/2)
  Reviews on Proceedings of the Institution of Mechanical Engineers Part O-Journal of Risk and Reliability: Write a review
Author: Andy234


Subject Area: Engineering
Duration of Peer Review: 7.0 month(s)
Result: Accepted after revision


Write a review

Reviewed 2020-05-17 20:26:00
Submitted on August 2, 2019; and received comments on April 21, 2020 requiring for major revision; revision submitted on May 10; accepted on the May 16. There are few journals in the field of reliability, and the quality of this journal is still good. Algorithm innovation is required.

(4) Thank | Andy234

Author: 笨猫


Subject Area: Management
Duration of Peer Review: 6.0 month(s)
Result: Accepted after revision


Write a review

Reviewed 2017-07-18 06:43:11
I have published several articles here. Qingqing Zhai, Rui Peng*, L. Xing, and Jun Yang, 2013. "BDD-based Reliability Evaluation of k-out-of-(n k) Warm Standby Systems Subject to Fault-Level Coverage," Journal of Risk and Reliability,227(5): 540-548. Xiao Hui, Peng R.*, Wang, WB, Zhao, F., 2015. Optimal Element Loading for Linear Sliding Window Systems. Journal of Risk and Reliability 230 (1), 75-84.

(1) Thank | 笨猫

Author: Letpub12300


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-09-18 17:25:01
November 22, 23 Submit
September 18, 24 Peer review in process

Not much to say about what ingredients
Show Review in Original Language
(1) Thank | Letpub12300

Author: alpha2020


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-05-30 13:09:16
This journal is really risky to submit to, it's way out of line. The review process takes forever. After major revisions on the first round, the reviewers requested minor revisions, including changes to figures and formulas. It took 3 months to hear back with their feedback. Then, there was no response for two months after resubmission. The entire manuscript processing time has already been 1.5 years. When inquired via email, it was explained that the original reviewers declined to review again, so new reviewers need to be invited. Do the editors have no judgment at all?
Show Review in Original Language
(0) Thank | alpha2020

Author: 惘然子期


Subject Area: Engineering
Duration of Peer Review: 2.0 month(s)
Result: Accepted after revision


Write a review

Reviewed 2024-03-31 01:58:41
The review period is approximately one and a half months
Submitted on July 16, 23
Major revisions on August 30
Revision on October 12
Returned on November 19, stated as major revisions, but most of the review has been agreed upon, with the editor giving 5 review comments
Revised on January 11, 24
Accepted on January 22, published on February 29
Both the review experts and the editor are very professional
The provided revision time is very ample, ranging from 2-3 months, even if the issue could be resolved in one day
Show Review in Original Language
(0) Thank | 惘然子期

Author: zchn12


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-03-18 09:29:35
It is either an external review, or the journal is looking for reviewers. I waited for 9 months during the first phase. And into the second phase, it has been another 6 months and still no news
Show Review in Original Language
(0) Thank | zchn12

Author: zchn12


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-03-18 09:28:09
It must be very slow. I submitted an article 22 years ago, and each time the revision period is basically eight or nine months. Those in a hurry should be cautious about submitting. The reviewers are indeed very professional
Show Review in Original Language
(0) Thank | zchn12

Author: 章鱼chen儿920


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2023-10-30 16:47:14
Hello, how long does the "peer review in process" stage usually take? Has it already entered the external review stage? No changes after three months...graduating students are very anxious
Show Review in Original Language
(0) Thank | 章鱼chen儿920

Author: alpha2020


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2023-10-21 13:31:07
Submitted on January 18th, 23.
Revised on September 7.
Resubmitted on September 28.
Still no news.
The reviewers are very professional, but they are really slow
Show Review in Original Language
(0) Thank | alpha2020

Author: 章鱼chen儿920


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2023-10-16 08:51:25
Hello senior, may I ask how long did you wait during the Peer review in process stage? Is this in the external review status? I am a bit anxious, it has been two and a half months and still no news
Show Review in Original Language
(0) Thank | 章鱼chen儿920

Author: zchn12


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2023-03-09 11:24:43
Not very fast, it takes about four months from submission to receiving feedback. The revision time would also take at least one or two months, which may not be suitable for those who are in a hurry to graduate. The journal reviewers are quite professional and their questions are accurate, requiring a certain level of innovation.
Show Review in Original Language
(0) Thank | zchn12

Author: piepie


Subject Area: 管理学
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2023-02-20 18:57:09
Is the review speed fast?
Show Review in Original Language
(0) Thank | piepie

Author: piepie


Subject Area: 管理学
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2023-02-18 14:28:15
May I ask how long is the review period for senior editors? Is there a high requirement for innovation?
Show Review in Original Language
(0) Thank | piepie

Author: piepie


Subject Area: 管理学
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2023-02-17 09:52:12
How long is the submission period? Is the requirement for content and algorithm innovation high?
Show Review in Original Language
(0) Thank | piepie

Author: piepie


Subject Area: 管理学
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2023-02-17 09:50:44
Is this journal article demanding a lot of innovation, including algorithms and content?
Show Review in Original Language
(0) Thank | piepie

Author: miracle666


Subject Area: Engineering
Duration of Peer Review: 1.0 month(s)
Result: Accepted after revision


Write a review

Reviewed 2022-11-20 15:09:30
2022.8.10 Delivery
2022.9.21 Major repair
2022.10.31 Return of manuscript
Received one week later
Show Review in Original Language
(3) Thank | miracle666

Author: zchn12


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2022-11-08 09:54:54
Yes, please wait a moment longer.
Show Review in Original Language
(0) Thank | zchn12

Author: zchn12


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2022-11-08 09:53:27
It has been approximately half a month.
Show Review in Original Language
(0) Thank | zchn12

Author: zchn12


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2022-10-31 17:09:56
May I ask how long after returning from the major revision you uploaded the modified draft?
Show Review in Original Language
(0) Thank | zchn12

Author: zchn12


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2022-10-31 17:08:52
May I ask how long after returning from the overhaul did you upload the revised draft?
Show Review in Original Language
(0) Thank | zchn12

Author: 贺啦啦啦


Subject Area: Multidisciplinary
Duration of Peer Review: 5.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2022-08-05 18:19:10
This journal is too slow.
Submitted on 4.19.
Reviewed on 4.20.
It's already 8.5 and it's still under review. Unbelievable, the peer review process is also too slow.
Show Review in Original Language
(2) Thank | 贺啦啦啦

Author: 麦子粉


Subject Area: Engineering
Duration of Peer Review: 5.0 month(s)
Result: Accepted after revision


Write a review

Reviewed 2022-07-21 14:42:29
2021.11.3 Submission
2022.3.25 Feedback for revision, major revision
2022.5.13 Submission of revised version
2022.7.18 Acceptance

The reviewers and editors were both very good!
Show Review in Original Language
(3) Thank | 麦子粉

Author: Feng77


Subject Area: Engineering
Duration of Peer Review: 2.0 month(s)
Result: Accepted after revision


Write a review

Reviewed 2022-07-11 15:33:00
Submitted in mid-February.
Received feedback for revision at the end of March, requiring major revisions.
Received feedback for revision in mid-May, requiring minor revisions.
Accepted on July 11th.
Two reviewers provided many constructive comments.
The editor was very diligent and reliable. The feedback was provided promptly. It is worth submitting.
Show Review in Original Language
(12) Thank | Feng77

Author: 爱祖国


Subject Area: 管理学
Duration of Peer Review: 3.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2022-01-15 14:46:08
Excuse me, senior, for this journal submission, it is currently in the peer review process. Is it under external review?
Show Review in Original Language
(0) Thank | 爱祖国

Author: WW


Subject Area: Engineering and Materials
Duration of Peer Review: 8.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2017-10-27 14:54:36
The intersection of mechanical engineering disciplines, the quality of journals is very good, hope to be able to!!
Show Review in Original Language
(6) Thank | WW

First    Previous    1    2    Next    Last  (To Page
/2)

Start your review of [Proceedings of the Institution of Mechanical Engineers Part O-Journal of Risk and Reliability]:







© 2010-2025  ACCDON LLC 400 5th Ave, Suite 530, Waltham, MA 02451, USA
PrivacyTerms of Servic