Research Creative   My Account   Submit My Manuscript
Letpub, Scientific Editing Services, Manuscript Editing Service

Browse Journals by Title


Journal name:   ISSN:   Subject area:   IF range: -
Index:   Category:   Open Access:   Sort by:
Journal Cover Design
APA has partnered with LetPub to provide a full suite of author services

[PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING]Hello, you are Visitor Number 33212 on this page.

Journal Profile
Journal TitlePROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING
Journal Title AbbreviationsP I CIVIL ENG-GEOTEC
ISSN1353-2618
E-ISSN1751-8563
h-index34
CiteScore
CiteScoreSJRSNIPCiteScore Rank
4.400.5910.834
Subject fieldQuartilesRankPercentile
Category: Earth and Planetary Sciences
Subcategory: Earth and Planetary Sciences (miscellaneous)
Q245 / 159
Category: Earth and Planetary Sciences
Subcategory: Geotechnical Engineering and Engineering Geology
Q279 / 229

Self-Citation Ratio (2020-2021)6.80%
期刊简介Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
Official Websitehttp://www.icevirtuallibrary.com/toc/jgeen/current
Online Manuscript Submissionhttp://www.icevirtuallibrary.com/page/submit
Open AccessNo
PublisherTHOMAS TELFORD PUBLISHING, THOMAS TELFORD HOUSE, 1 HERON QUAY, LONDON, ENGLAND, E14 4JD
Subject AreaEngineering
Country/Area of PublicationENGLAND
Publication FrequencyQuarterly
Year Publication Started0
Annual Article Volume47
Gold OA文章占比
OA期刊相关信息
WOS期刊SCI分区
Indexing (SCI or SCIE)Science Citation Index Expanded
Link to PubMed Central (PMC)https://www.ncbi.nlm.nih.gov/nlmcatalog?term=1353-2618%5BISSN%5D
Average Duration of Peer Review *Authorized Data from Publisher:
Data from Authors: >12 Week(s), or Invited contributions
Competitiveness *Data from Authors: Easy
Useful Links
Relevant Journals 【PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING】CiteScore Trend
Comments from Authors
*All review process metrics, such as acceptance rate and review speed, are limited to our user-submitted manuscripts. As such they may not reflect the journals' exact competitiveness or speed.
  • Journals in the Same Subject Area
  • CiteScore Trend


First    Previous    1    2    3    Next    Last  (To Page
/3)
  Reviews on PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING: Write a review
Author: 会飞的大头鱼


Subject Area: Engineering
Duration of Peer Review: 1.0 month(s)
Result: Rejected


Write a review

Reviewed 2020-10-27 15:25:11
The review speed of this time was fast, and the result was released in half a month. There were several comments given, and it was rejected.

(2) Thank | 会飞的大头鱼

Author: cuvette


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-04-10 16:40:44
Six months passed, still no response.
Show Review in Original Language
(0) Thank | cuvette

Author: ylc1203


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-04-09 09:15:07
It has been five months since Xiao Xiu submitted the revised manuscript, still no news. I seriously suspect that the responsible editor has run away!!!
Show Review in Original Language
(0) Thank | ylc1203

Author: jhui


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-12-13 08:19:02
I have also been conducting pre-assessments.
Show Review in Original Language
(0) Thank | jhui

Author: Dcc


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-11-02 19:36:38
I have submitted my paper three months ago, but the status is still Pre-assessment. I have sent an email to inquire, but have not received any response. I cannot wait any longer and have decided to withdraw the submission. Should I send the withdrawal email through the "Contact Us" option in the ReView system? Do I need to receive a response from the editor agreeing to the withdrawal before I can submit to another journal?
Show Review in Original Language
(0) Thank | Dcc

Author: ylc1203


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-10-09 11:38:09
It is still the initial review by the editorial department. If it has not been reviewed for 8 months, don't even think about sending it for external review. The reluctance of experts to review manuscripts is one reason, and the procrastination of the chief editor is another.
Show Review in Original Language
(0) Thank | ylc1203

Author: Dcc


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-09-05 09:04:19
May I ask if "Pre-assessment: in progress" means it is still under preliminary review? It has been over a month now.
Show Review in Original Language
(0) Thank | Dcc

Author: Dcc


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-09-05 09:03:30
Pre-assessment: in progress. Is it still in the editing and initial review stage? It has been over a month.
Show Review in Original Language
(0) Thank | Dcc

Author: 1


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-07-20 14:13:58
Please translate the following paragraph into English: 问
Show Review in Original Language
(0) Thank | 1

Author: cuvette


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-06-22 11:29:16
The editor decision has been over two months already. It's too slow.
Show Review in Original Language
(0) Thank | cuvette

Author: ylc1203


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-06-20 05:05:03
I am not sure about this either, because it has been a long time since the last major revision was given, and I haven't really paid much attention to it since then. Suddenly one day, a message about a major revision was sent.
Show Review in Original Language
(0) Thank | ylc1203

Author: cuvette


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-06-18 16:08:10
How long did the editor decision status last before receiving the outcome?
Show Review in Original Language
(0) Thank | cuvette

Author: ylc1203


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-06-15 16:56:05
The latest news, submitted in September of  
23, and major revisions were made in May of 24, lasting 8 months. Please be cautious if you are in a hurry to submit, as it is unknown how long it will take to return the revised work
Show Review in Original Language
(0) Thank | ylc1203

Author: ylc1203


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-03-04 22:05:17
May I ask how to urge manuscript submission for this journal? I could only find one channel for sending emails to all ICE journals
Show Review in Original Language
(0) Thank | ylc1203

Author: enki


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-02-27 10:33:52
The weather today is very sunny, making people feel happy
Show Review in Original Language
(0) Thank | enki

Author: enki


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-02-22 13:48:46
Please translate the following paragraph into English and Japanese, and use ":" and "
Show Review in Original Language
(0) Thank | enki

Author: ylc1203


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-02-18 11:38:44
The editing has been stuck for over 4 months and was just submitted for review a week ago, it's too slow
Show Review in Original Language
(0) Thank | ylc1203

Author: ylc1203


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-02-18 11:37:52
The editing process took 4 months and was just submitted for review last week
Show Review in Original Language
(0) Thank | ylc1203

Author: potatoe


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-01-09 21:51:49
It should still be in the initial review stage, and the status will change to review once the initial review is completed
Show Review in Original Language
(0) Thank | potatoe

Author: summer2024


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-01-09 10:37:09
EiC Pre-assessment: ready means that the preliminary review has been completed?
Show Review in Original Language
(0) Thank | summer2024

Author: summer2024


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-01-09 10:35:07
Could you please confirm what "EiC Pre-assessment: ready" means? Does it indicate that the initial review has been completed?
Show Review in Original Language
(0) Thank | summer2024

Author: potatoe


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2024-01-04 09:45:16
This means it still needs to be reviewed by the editorial department
Show Review in Original Language
(0) Thank | potatoe

Author: ylc1203


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2023-12-01 10:14:17
What does changing EIC PRE-ASSEMENT to PRE-ASSEMENT mean?
Show Review in Original Language
(0) Thank | ylc1203

Author: ylc1203


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2023-11-21 10:56:02
Brothers, be careful when submitting to this journal. It's too slow. The editor has been holding onto it for over a month and gave me a suggestion to remove some of the references because there were too many. Then, it went back to the editor and was held onto for another month. Many journals provide feedback on references along with the review results, but this mediocre journal has been sitting with the editor for over two months. It's too prestigious, and I can't keep up. I've been trying to submit for over two months now, but I'm in a tough spot
Show Review in Original Language
(1) Thank | ylc1203

Author: ylc1203


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2023-10-24 10:55:33
Have you followed up? Any updates? It has been over a month since I submitted it, but it has not been sent for review yet
Show Review in Original Language
(0) Thank | ylc1203

First    Previous    1    2    3    Next    Last  (To Page
/3)

Start your review of [PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING]:







© 2010-2025  ACCDON LLC 400 5th Ave, Suite 530, Waltham, MA 02451, USA
PrivacyTerms of Servic