Research Creative   My Account   Submit My Manuscript
Letpub, Scientific Editing Services, Manuscript Editing Service

Browse Journals by Title


Journal name:   ISSN:   Subject area:   IF range: -
Index:   Category:   Open Access:   Sort by:
Journal Cover Design
APA has partnered with LetPub to provide a full suite of author services

[IEEE TRANSACTIONS ON INSTRUMENTATION AND MEASUREMENT]Hello, you are Visitor Number 2602126 on this page.

Journal Profile
Journal TitleIEEE TRANSACTIONS ON INSTRUMENTATION AND MEASUREMENT
Journal Title AbbreviationsIEEE T INSTRUM MEAS
ISSN0018-9456
E-ISSN1557-9662
h-index100
CiteScore
CiteScoreSJRSNIPCiteScore Rank
10.101.4711.829
Subject fieldQuartilesRankPercentile
Category: Physics and Astronomy
Subcategory: Instrumentation
Q113 / 174
Category: Physics and Astronomy
Subcategory: Electrical and Electronic Engineering
Q198 / 970

Self-Citation Ratio (2020-2021)24.30%
期刊简介Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
Official Websitehttp://ieeexplore.ieee.org/xpl/RecentIssue.jsp?punumber=19
Online Manuscript Submissionhttps://www.editorialmanager.com/TIM
Open AccessNo
PublisherIEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC, 445 HOES LANE, PISCATAWAY, USA, NJ, 08855-4141
Subject AreaEngineering
Country/Area of PublicationUNITED STATES
Publication FrequencyBimonthly
Year Publication Started0
Annual Article Volume2532
Gold OA文章占比
OA期刊相关信息
WOS期刊SCI分区
Indexing (SCI or SCIE)Science Citation Index
Science Citation Index Expanded
Link to PubMed Central (PMC)https://www.ncbi.nlm.nih.gov/nlmcatalog?term=0018-9456%5BISSN%5D
Average Duration of Peer Review *Authorized Data from Publisher:
Data from Authors: About 6.8 month(s)
Competitiveness *Data from Authors: About 25%
Useful Links
Relevant Journals 【IEEE TRANSACTIONS ON INSTRUMENTATION AND MEASUREMENT】CiteScore Trend
Comments from Authors
*All review process metrics, such as acceptance rate and review speed, are limited to our user-submitted manuscripts. As such they may not reflect the journals' exact competitiveness or speed.
  • Journals in the Same Subject Area
  • CiteScore Trend


First    Previous    1    2    3    4    5    6    7    Next    Last  (To Page
/138)
  Reviews on IEEE TRANSACTIONS ON INSTRUMENTATION AND MEASUREMENT: Write a review
Author: oooophilia


Subject Area: Engineering
Duration of Peer Review: 3.0 month(s)
Result: Accepted after revision


Write a review

Reviewed 2020-05-15 12:12:57
2.11 Submission; 2.17 Editor required us to complete author information during the submission process; 2.17 Submission completed; 3.22 Major revision required by the first review submitted; 4.12 with editor; 4.13 under review; 4.15 required reviews completed; 4.25 Major revision required by the second review; 5.5 Major revision submitted; 5.6 with editor; 5.7 under review; 5.10 required reviews completed; 5.11 decision in process; 5.11 accept. There were 5 reviewers for the first review, who all gave good comments. Two of them wanted us to add experimental parts, and one reviewer raised new ideas. A new experimental part was added in the major revision. The reviewer’s new ideas cannot be realized due to limited conditions (mainly because I don’t know how. Hahahaha). The answer was "Thank you for the reviewer’s suggestion. I will refer to it in the following researches." The four reviewers for the second review all expressed satisfaction with our answers, and one reviewer still had comments. The editor required a major revision, and we answered the reviewer's questions in the major revision. The paper was revised a little and submitted, and then accepted.

(13) Thank | oooophilia

Author: Mavis


Subject Area: Engineering
Duration of Peer Review: 10.0 month(s)
Result: Accepted after revision


Write a review

Reviewed 2020-01-07 20:41:41
Submitted in March 2019. A few days later it was directly rejected by the editor and was told that the first section in the article was with too few references and the structure needed to be optimized. It was recommended resubmitting. Then the review comments were given in May that it was rejected, but it can still be resubmitted. The reviewers were also very rigorous. The three reviewers gave more than 30 review comments, and the requirements for the experiment were very detailed. The third reviewer directly said that the article had a relatively simple idea and a narrow application field. After adding seven or eight pages of experimental content and writing more than ten pages of responses, the manuscript was submitted again in early September. Major revision was requested in early November and it should be returned and resubmitted within 20 days. The reviewers were not very rigorous as last time. But the third reviewers continued to question the application area. It was revised and retuned again at the beginning of December, but it was delayed for a few days due to the issue of the exceeded page agreement (The exceeded agreement must be submitted for each submission). After 20 days, I received review comments requesting minor revisions. The reviewer suggested to streamline the article. It was then revised and returned after four days, and accepted after two days. It took ten months for the whole review period which was with two rejections, one major revision and one minor revision. The review process is step-by-step, and it is very fast to send for review. The editors generally make decisions quickly. The review comments given by the reviewers have greatly improved the quality of the article and my writing ability.

(29) Thank | Mavis

Author: zarathustr


Subject Area: Engineering
Duration of Peer Review: 12.0 month(s)
Result: Rejected


Write a review

Reviewed 2019-07-12 02:53:11
Several other articles have been submitted to TIM. The processes are as follows. The first article was submitted in May 2017, the first revision in August 2017, the second revision in December 2017, and the manuscript was rejected in February 2018 (the journal does not allow another major revision after two major revisions). The editor-in-chief allowed us to resubmit. The revised submission was made in July, 2019, and revision was required in early January 2019. It was revised again in March 2019, and got rejected in April 2019 and the editor-in-chief did not allow resubmission. (Two consecutive resubmissions are not allowed). The first article has been reviewed for 6 rounds in the two years, 15 reviewers, and the response letter has exceeded more than 200 pages. It is still under review in a journal and will definitely be accepted by a good one. The second article was submitted in September 2018, and revised in December 2018. It got rejected in February 2019, as the reviewer believed that the problem he raised was not solved. It was allowed to resubmit, but we did not try, and changed to submit to IEEE Sensors Journal. It then got accepted at the end of June 2019. Two other articles have submitted to TIM, but they were not in scope and got rejected. They were finally published in Measurement Science and Technology and IEEE Transactions on Consumer Electronics, respectively.

(20) Thank | zarathustr

Author: 火极星


Subject Area: Engineering and Materials
Duration of Peer Review: 6.0 month(s)
Result: Accepted after revision


Write a review

Reviewed 2018-03-30 00:55:10
The requirements are still very strict, and it has high requirements for innovation, rigor and practicality.

(14) Thank | 火极星

Author: jfgx


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-07-31 10:29:18
It is possible that your manuscript did not meet the requirements of that editor, so it was passed on to another editor. I am also in this situation and have already submitted for review.
Show Review in Original Language
(0) Thank | jfgx

Author: nanaz


Subject Area: 计算机科学
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-07-31 09:37:33
My situation is the same. MS changes to WE and then back to MS. Is it because of the guidance book? What should I do next?
Show Review in Original Language
(0) Thank | nanaz

Author: Heyuuuuu


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-07-29 20:35:28
Could you please clarify how the change in "under review" status is determined?
Show Review in Original Language
(0) Thank | Heyuuuuu

Author: ETATA


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-07-27 18:20:22
7.27 Accept!! It lasted a whole year. It was so difficult.
Show Review in Original Language
(0) Thank | ETATA

Author: ETATA


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-07-27 14:48:23
7.27 Decision in Process
Show Review in Original Language
(0) Thank | ETATA

Author: ETATA


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-07-26 13:11:37
7.20 Required Reviews Completed, but there have been no new changes as of the current status.
Show Review in Original Language
(0) Thank | ETATA

Author: YCdreaming


Subject Area: Engineering
Duration of Peer Review: 3.0 month(s)
Result: Accepted after revision


Write a review

Reviewed 2025-07-25 19:38:50
September 28, 2024 Manuscript Submitted
October 16, 2024 With Editor
October 19, 2024 Under Review
February 8, 2025 Decision in Process
February 18, 2025 Major Revision
March 11, 2025 Manuscript Submitted
March 12, 2025 With Editor
March 13, 2025 Under Review
March 31, 2025 Reject & Resubmit
April 23, 2025 Manuscript Submitted
April 30, 2025 With Editor
July 19, 2025 Minor Revision
July 20, 2025 Manuscript Submitted
July 25, 2025 Accept
Show Review in Original Language
(0) Thank | YCdreaming

Author: Jayyu


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-07-25 17:58:12
Hey buddy, what's the status of your manuscript now? My submission time is almost the same as yours.
Show Review in Original Language
(0) Thank | Jayyu

Author: 乌龟压死猪


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-07-24 07:04:06
Dear bosses, it has been five days since the status Manuscript Submitted, is this normal?
Show Review in Original Language
(0) Thank | 乌龟压死猪

Author: Zwjjj


Subject Area: 计算机科学
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-07-22 14:29:43
May I ask if the email from the editor was a rejection or a request for resubmission?
Show Review in Original Language
(1) Thank | Zwjjj

Author: Legend_WSY


Subject Area: Engineering
Duration of Peer Review: 1.0 month(s)
Result: Accepted directly


Write a review

Reviewed 2025-07-21 21:01:57
Which day was it submitted?
Show Review in Original Language
(0) Thank | Legend_WSY

Author: Legend_WSY


Subject Area: Engineering
Duration of Peer Review: 1.0 month(s)
Result: Accepted directly


Write a review

Reviewed 2025-07-21 21:00:46
7.15 returned for rework, still no word on when it will be completed. It's been 6 days already, strange.
Show Review in Original Language
(0) Thank | Legend_WSY

Author: sssscccc


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-07-21 16:00:34
The same question, the first review gave minor revisions, two reviewers, it's been a month and a half and still no news. Feeling a bit anxious.
Show Review in Original Language
(0) Thank | sssscccc

Author: 学术屎山拉屎大师


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-07-21 15:15:24
Just received the review, have the submission number for this year already exceeded 7300? It's terrifying, is it going to become a mega journal this year?
Show Review in Original Language
(0) Thank | 学术屎山拉屎大师

Author: 求个学上哇 不然就去当柜员了


Subject Area: 计算机科学
Duration of Peer Review: 2.0 month(s)
Result: Rejected


Write a review

Reviewed 2025-07-21 13:33:10
2D + deep learning + defect detection, which is not in line with the journal's scope, is estimated to be restricted, not submitted for review, and directly rejected by the editor-in-chief.

Please note that defect detection in image space itself is not an I&M topic. Therefore, it seems to be beyond the scope of TIM.
Show Review in Original Language
(0) Thank | 求个学上哇 不然就去当柜员了

Author: zhj12399


Subject Area: 计算机科学
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-07-20 22:39:36
I have been waiting for two weeks for my Dip results, but still haven't received them. It's very strange.
Show Review in Original Language
(0) Thank | zhj12399

Author: ML___


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-07-20 12:01:35
Can I ask what happened next?
Show Review in Original Language
(0) Thank | ML___

Author: Mengnan Wang


Subject Area: 计算机科学
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-07-17 14:34:02
Jul 15 2025 4:07AM Manuscript Submitted.
Show Review in Original Language
(0) Thank | Mengnan Wang

Author: 子期LZJT


Subject Area: 计算机科学
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-07-16 22:32:51
Hello, I would like to ask about my submission a few days ago. The editor informed me that my manuscript is beyond the scope of the journal's submission guidelines and suggested a reject & resubmit. I feel like it has been rejected, so is it necessary to revise and resubmit?
Show Review in Original Language
(0) Thank | 子期LZJT

Author: Wanglaoban


Subject Area: Engineering
Duration of Peer Review: 0.0 month(s)
Result: Pending & Unknown


Write a review

Reviewed 2025-07-15 15:57:42
1.22 submit
3.7 reject & resubmit
4.28 revise & resubmit
6.28 decision in process

Today, July 15th, during the dip period, I have sent multiple emails to the editorial department, and the response has always been that the editors are considering the final decision. During the first review, the total number of comments from four people was less than 15, and it has been over two weeks since the dip was sent back for revisions. The direction we took was combining 2D defect detection with deep learning, and it doesn't feel good.
Show Review in Original Language
(0) Thank | Wanglaoban

Author: yomi_icecat


Subject Area: Engineering
Duration of Peer Review: 6.0 month(s)
Result: Accepted after revision


Write a review

Reviewed 2025-07-14 20:33:55
My payment notice was sent on the fifth day after the proofreading of the manuscript. If you can log in to the corresponding author's email, you can find the email "Please Submit Your IEEE Article Processing Charge(s)" to make the payment online. It may end up in the spam folder, but if you are self-funded, you may need to apply for a visa credit card that can pay in foreign currency.
Show Review in Original Language
(0) Thank | yomi_icecat

First    Previous    1    2    3    4    5    6    7    Next    Last  (To Page
/138)

Start your review of [IEEE TRANSACTIONS ON INSTRUMENTATION AND MEASUREMENT]:







© 2010-2025  ACCDON LLC 400 5th Ave, Suite 530, Waltham, MA 02451, USA
PrivacyTerms of Servic